Verify the Plan

To verify the file copy plan, confirm that you have successfully created the plan. After you verify that the plan is created successfully, check whether the backup job is running as scheduled. After the backup job successfully completes, the file copy job runs as scheduled. You can check the status of the backup job and the file copy job from the jobs tab.

Follow these steps to verify plans:

  1. Click the resources tab.
  2. From the left pane, navigate to Nodes, and click All Nodes.
  3. A list of all nodes is displayed on the center pane.
  4. Verify that plans are mapped with nodes.

Follow these steps to verify file copy jobs:

  1. Click the jobs tab.
  2. From the left pane, click All Jobs Completed.
  3. The status of each job is listed on the center pane.
  4. Verify that the backup job and file copy job is successful.