(Optional) Run the Assured Recovery Test Job Manually
In Arcserve UDP all plans, including Assured Recovery jobs, are performed automatically and are controlled by the schedule settings. For Assured Recovery jobs, besides the scheduled run, Arcserve UDP lets you perform manual test of nodes and plans for Assured Recovery Test. This topic provides separate procedures to perform a manual Assured Recovery Test of node and plan.
Follow these steps to perform a manual Assured Recovery Test of node:
- From the Console, click the resources tab.
- From the left pane, navigate to Nodes, and click All Nodes.
- From the center pane, select the nodes that has an Assured Recovery plan assigned and click Actions.
- From the options displayed for Actions, click Run Assured Recovery Test Now.
- Select an Assured Recovery task and a recovery point, and click OK.
The Assured Recovery dialog opens.
The Assured recovery test of node runs.
Follow these steps to perform a manual Assured Recovery Test of plan:
- From the Console, click the resources tab.
- From the left pane, navigate to Plans, and click All Plans.
- From the center pane, select an Assured Recovery plan and click Actions.
- From the options displayed for Actions, click Run Assured Recovery Test Now.
- Select an Assured Recovery task and one of the options for recovery point, and click OK.
The Assured Recovery dialog opens.
The Assured recovery test of plan runs.