Settings › Configure the Copy Recovery Point Settings › Copy Recovery Points - Example Scenarios
Copy Recovery Points - Example Scenarios
The following example scenarios are provided to give you a better understanding of how the various options can affect your scheduled copying of recovery points.
For this example, assume that you configured your CA ARCserve D2D backup schedule as follows:
- Full Backup - Every 7 days
- Incremental Backup - Every 1 hour
- Verify Backup - Every 3 days
and assume:
- First backup is on Day #1 at 5:00PM (by default, the first backup is always a Full Backup)
- First Incremental Backup will be on Day #1 at 6:00PM (and every hour after)
- Recovery Points retention count is set to 31 (default number)
- Location "D" is configured as the copy destination
Scenario #1
For this scenario, the Copy Recovery Point settings are as follows:
- Copy after 4 backups
- Retain 1 recovery point
Result:
Scenario #2
For this scenario, the Copy Recovery Point settings are as follows:
- Copy after 4 backups
- Retain 4 recovery points
Result:
- At 8:00PM (after the 4th backup), the scheduled copy job will run and consolidate all 4 recovery points into a single recovery point (Recovery Point #1) and store it at destination D.
- At 12:00 midnight (after the 8th backup), the next scheduled copy job will run to create Recovery Point #2 and store it at destination D.
- At 4:00AM on Day #2 (after the 12th backup), the next scheduled copy job will run to create Recovery Point #3 and store it at destination D.
- At 8:00AM on Day #2 (after the 16th backup), the next scheduled copy job will run to create Recovery Point #4 and store it at destination D.
- At 12:00 noon on Day #2 (after the 20th backup), the next scheduled copy job will run. A new recovery point will be created and the first recovery point (created after the 8:00PM backup on previous day) is removed from destination D, because the setting is to retain only 4 recovery points at the destination.
Scenario #3
For this scenario, the Copy Recovery Point settings are as follows:
- Copy after 1 backup
- Retain 4 recovery points
Result:
- At 5:00PM (after the 1st backup), the scheduled copy job will run to create a single recovery point (Recovery Point #1) and store it at destination D.
- At 6:00PM (after the 2nd backup), the next scheduled copy job will run to create Recovery Point #2 and store it at destination D.
- At 7:00PM (after the 3rd backup), the next scheduled copy job will run to create Recovery Point #3 and store it at destination D.
- At 8:00PM (after the 4th backup), the next scheduled copy job will run to create Recovery Point #4 and store it at destination D.
- At 9:00PM (after the 5th backup), the next scheduled copy job will run. A new recovery point will be created and the first recovery point (created after the 5:00PM backup) is removed from destination D, because the setting is to retain only 4 recovery points at the destination.
Copyright © 2012 CA.
All rights reserved.
|
|