When you set the AR test to run in a scheduled mode, it means that an AR test will be performed automatically on a regular basis. After you select this option the following flexible scheduling capabilities are offered:
The AR test schedule can be set when the scenario is created or at a later stage.
Note: You can define only one scheduled task per scenario. If you attempt to configure AR testing while you already have a scheduled Suspend operation configured, the following message appears: Only one scheduled task per scenario can be set. Suspend for host [Replica_name] is already switched on. Do you want to turn this option off now? To switch the schedule option to the AR test, you need to click Yes.
To schedule the AR test
On the Framework pane on the left, select the properties tab.
The Replica Properties list appears.
The scenario is stopped.
The Assured Recovery hours dialog appears:
The Assured Recovery hours dialog is similar to the Schedule Setting dialog, which is used for scheduling automatic synchronization. For information about setting a schedule, see Schedule Synchronization.
The Replica you selected for testing will be tested on a regular basis according to the schedule you set.
Copyright © 2015 Arcserve.
All rights reserved.
|
|