Previous Topic: (Optional) Perform a Manual BackupNext Topic: Troubleshooting


Verify the Plan

To verify your backup, confirm that you have successfully created the backup plan. After you verify that the plan is created successfully, confirm whether the backup job is running as scheduled. You can verify the status of backup jobs from the jobs tab.

Follow these steps: to verify plans

  1. Click the Resources tab.
  2. From the left pane, navigate to Nodes, and click All Nodes.

    A list of all nodes is displayed on the center pane.

  3. Verify that plans are mapped with nodes.

Follow these steps: to verify backup jobs

  1. Click the jobs tab.
  2. From the left pane, click All Jobs.

    The status of each job is listed on the center pane.

  3. Verify that the backup job is successful.

The backup job is verified.