Add an Assured Recovery Task to the Plan

An assured recovery task includes an assured recovery task to an existing backup/replicate plan. Each task consists of parameters that define the source, task settings, schedule, and advanced settings. Create an Assured Recovery task based on backup/replication task to verify accessibility and assured recovery of the data and provide the data integrity check.

Follow these steps:

  1. Click the resources tab on the Console.
  2. From the left pane, navigate to Plans, and click All Plans.
  3. If you have created plans earlier, those plans are displayed on the center pane.
  4. From the center pane, open an existing backup or replication plan.
  5. In the selected plan, click Add a Task from the left pane.
  6. (Optional) Select the Pause this plan check box.
  7. The plan will not run until you clear the check box to resume the plan.
  8. Note: If you pause the plan, the Assured Recovery job will not start. When you resume the plan again, the Assured Recovery job is not resumed automatically. You have to manually run another backup job to start the Assured Recovery job.
  9. From the Task Type drop-down list, select Assured Recovery Test.
  10. Now specify the Source, Task settings (IVM or IVD), Schedule, and Advanced details.
  11. Click Save
  12. The changes are saved and the Assured Recovery task is automatically deployed.