![Previous Topic: Configure Deduplication Groups to Use Staging](574.png)
![Next Topic: Back up Data with Deduplication in a Staging Backup Job](573.png)
Using Deduplication › Back up Data with Deduplication › How Staging Jobs Work with Deduplication
How Staging Jobs Work with Deduplication
In a disk to disk to tape operation, you may specify a deduplication device group as the staging location, the final backup destination, or both, provided the same deduplication device group is not selected on both tabs.
- On the Staging Location tab, select the deduplication device group, enable staging and specify a staging policy.
- On the Destination tab, select a different deduplication device group and specify a purge policy. If you do not specify a purge policy, the default value of 4 weeks is inherited from deduplication device creation for full backups, and 2 weeks for incremental/differential backups.
- On the Schedule tab, set up the rotation or GFS schedule, if desired.
For more information, see How to Submit a Disk Staging Backup Job.
Copyright © 2016 .
All rights reserved.
![Previous Topic: Configure Deduplication Groups to Use Staging](574.png) ![Next Topic: Back up Data with Deduplication in a Staging Backup Job](573.png)
|
|