Previous Topic: Configure Remote ConvertersNext Topic: How to View Virtual Standby Settings from the Monitor Server


Verify the Plan

To verify your virtual standby feature, confirm that you have successfully created the virtual standby plan. After you verify that the plan is created successfully, check whether the backup job is running as scheduled. After the backup job successfully completes, the virtual standby job runs. You can check the status of the backup job and virtual standby job from the jobs tab.

Follow these steps to verify plans:

  1. Click the resources tab.
  2. From the left pane, navigate to Nodes, and click All Nodes.

    A list of all nodes is displayed on the center pane.

  3. Verify that plans are mapped with nodes.

Follow these steps to verify virtual standby jobs:

  1. Click the jobs tab.
  2. From the left pane, click All Jobs.

    The status of each job is listed on the center pane.

  3. Verify that the backup job and virtual standby job is successful.

    The plan for virtual standby is successfully verified.

The virtual standby machines for Arcserve High Availability nodes are created.