Previous Topic: Add a Replicate Task to the PlanNext Topic: Verify the Plan


(Optional) Perform a Manual Replication

To manually run a replication job, you must have at least one successful backup data. If you have not set the replication schedule, the replication job will run immediately after the backup job, otherwise, it depends on your replication schedule setting.

Follow these steps:

  1. Click the resources tab.
  2. From the left pane, navigate to Nodes, and click All Nodes.

    If you have added any plans, these plans will be displayed in the center pane.

  3. Select the nodes that you want to backup and that has a plan assigned to it.
  4. On the center pane, click Actions, Replicate Now.

    The Replicate node dialog opens.

  5. Select the Source RPS and Target RPS for the job.
  6. Click OK.

    The replication job runs.

The manual replication is successfully performed.