To manually run a replication job, you must have at least one successful backup data. If you have not set the replication schedule, the replication job will run immediately after the backup job, otherwise, it depends on your replication schedule setting.
Follow these steps:
If you have added any plans, these plans will be displayed in the center pane.
The Replicate node dialog opens.
The replication job runs.
The manual replication is successfully performed.
Copyright © 2016 |
|