The scheduling option lets you specify a Custom schedule or a Daily / Weekly / Monthly schedule, or both the schedules. In the Custom schedule, you can configure the backup schedule for each day of the week and you can add up to four backup schedules each day. You can select a specific day of a week and create a time window to define when to run backup and at what frequency.
Schedule |
Supported Job |
Comments |
Backup |
Backup job |
Define time windows to run backup jobs. |
Backup throttling |
Backup job |
Define time windows to control the backup speed. |
Merge |
Merge job |
Define when to run merge jobs. |
Daily schedule |
Backup job |
Define when to run daily backup jobs. |
Weekly schedule |
Backup job |
Define when to run weekly backup jobs. |
Monthly schedule |
Backup job |
Define when to run monthly backup jobs. |
You can also specify the retention settings for the recovery points.
Note: Retention settings must be set within each plan to control how data for the nodes assigned to that plan are retained at the target data store.
Schedules for Daily / Weekly / Monthly backups are independent to the Custom schedule, and each other. You can configure only to run Daily backup, Weekly backup or Monthly backup, without configuring the Custom schedule.
You can add four time windows per day in your backup schedule. A valid time window is from 12:00 AM until 11:59 PM. You cannot specify a time window such as 6:00 PM to 6:00 AM. In such cases, you have to manually specify two different time windows.
For each time window, the start time is inclusive, and the end time is exclusive. For example, you have configured to run Incremental Backup every one hour between 6:00 AM and 9:00 AM and the backup will start at 6:00 AM. This means the backup will run at 6:00 AM, 7:00 AM, 8:00 AM, but NOT 9:00 AM.
Note: If you want to run the backup job repeatedly until the end of day, set the schedule until 12:00 AM. For example, to run backup job every 15 minutes for the entire day, set the schedule from 12:00 AM to 12:00 AM, every 15 minutes.
Backup throttle schedule lets you control the backup throughput speed, which in turn controls the resource usage (disk I/O, CPU, network bandwidth) of the server being backed up. This is useful if you do not want to affect the server performance during business hours. You can add four time windows per day in your backup throttle schedule. For each time window, you can specify a value, in MB per minute. This value will be used to control the backup throughput. Valid values are from 1 MB/minutes to 99999 MB/minutes.
If a backup job extends its specified time, then the throttle limit will adjust according to the specified time window. For example, you have defined the backup throttle limit as 500 MB/minute from 8:00 AM to 8:00 PM, and 2500 MB/minute from 8:00 PM to 10:00 PM. If a backup job starts at 7:00 PM and it runs for three hours, then, from 7:00 PM to 8:00 PM the throttle limit will be 500 MB/minute and from 8:00 PM to 10:00 PM the throttle limit will be 2500 MB/minute.
If you do not define any backup schedule and backup throughput schedule, the backup will run as fast as it can.
Lets you merge recovery points based on the provided schedule.
Consider the following points for the merge job:
Copyright © 2015 |
|