To verify the copy recovery points feature, confirm that you have successfully created the plan. After you verify that the plan is created successfully, check whether the backup job is running as scheduled. After the backup job successfully completes, the copy recovery points job runs. You can check the status of the backup job and the copy recovery points job from the jobs tab.
Follow these steps to verify plans:
A list of all nodes is displayed on the center pane.
Follow these steps to verify copy recovery points jobs:
The status of each job is listed on the center pane.
Copyright © 2015 |
|