Typically, backups are performed automatically and are controlled by the schedule settings. In addition to the scheduled backup, a manual backup provides you the option to back up your nodes on a need basis. For example, if you have a repeat schedule for Full, Incremental, and Verify backups and you want to make major changes to your machine, you should perform an immediate manual backup without waiting for the next scheduled backup to occur.
Follow these steps:
Nodes are displayed in the center pane.
The Run a backup now dialog opens.
The backup job runs.
The manual backup is successfully performed.
Copyright © 2016 |
|