To verify your backup, confirm that you have successfully created the backup plan. After you verify that the plan is created successfully, confirm whether the backup job is running as scheduled. You can verify the status of backup jobs from the Jobs tab.
Follow these steps: to verify plans
A list of all nodes is displayed on the center pane.
Follow these steps: to verify backup jobs
The status of each job is listed on the center pane.
The backup job is verified.
Copyright © 2016 |
|